Tag Archives: chines

Planking done!

Could it be?  After those last few temporary screws went in the bottom, I realize the planking is all done! Sure the bottom still needs trimming – but a milestone in my mind anyhow. It took me about six hours … Continue reading

Posted in Sharpie build | Tagged , , , , , , | 2 Comments

More fairing fun and a good lashing

Lots of planing this weekend. Fairing the chines and sheer clamps. (hope I’m using all the right terms/names) Transom frame is all padded out and cleaned up, faired. Fairing the stringers was not possible at the molds because I had … Continue reading

Posted in Sharpie build | Tagged , , , , | Leave a comment

Chines and sheer clamps

I’ve made some progress on my sharpie. Chines and sheer clamps fitted and glued up. They were all left long on the transom end. Once the epoxy sets up good and hard I’ll trim them off flush. Still lots of … Continue reading

Posted in Sharpie build | Tagged , , , , , | 2 Comments

Stick-Up Sharpie

I’m starting a new blog here to follow along on the build of a 13′ stick-up rigged sharpie. Some work has already been started – the strongback and molds are set up. That has taken me a couple weekends so … Continue reading

Posted in Sharpie build | Tagged , , , , , | 2 Comments